Login|Register|Forget password|Dashboard Back to Home|Contact|Shopcart
Unverified1st Year

Wincoo Engineering Co., Ltd.  

Auto, Motorcycle Parts & Accessories,Construction & Decoration,Electrical & Electronics,Furniture,Industrial Equipment & Components,Manufacturing & Processing Machinery,Metallurgy, Mineral & Energy,Packaging & Printing,Service,Tools & Hardware

Search
新闻中心
  • 暂无新闻
产品分类
  • 暂无分类
联系方式
  • 联系人:Jacky Nie
  • 电话:86-15358182650
  • 传真:86-25-86281070
站内搜索
 
荣誉资质
  • 暂未上传
友情链接
  • 暂无链接
首页 > Products > Jacks/Hydraulic Jack/Jacking System for Tanks
Jacks/Hydraulic Jack/Jacking System for Tanks
单价 $3.00 / Piece对比
询价 暂无
浏览 102
发货 Chinajiangsunanjing
库存 5000Piece
过期 长期有效
更新 2020-09-06 14:32
 
详细信息
Product Name: Jacks/Hydraulic Jack/Jacking System for Tanks Condition: New Certification: ISO 9001:2000 Max Height: >400mm Power Source: Hydraulic Capacity (Load): 21-30T Structure: Hydraulic Jack Type: Hydraulic Jack Engineer Oversea Service Is Available: More Than 5 Meter Tank Trademark: WINCOO Transport Package: Container Specification: SGS, ISO9001, CE Origin: China HS Code: 8425421000 Product Description We are able to provide complete solution for tank welding with different construction method, both bottom-to-top and top-to-bottom tank construction, hydraulic lifting system are especially designed for top-to-bottom tank erection.The following short description gives the working procedure in outline. It can in certain details be modified when required.Step 1. The tank bottom - plates are placed on the prepared foundation and welded together.Step 2. The beams or lattice work of the roof are assembled and finally joined to the upper rim of the shell ring.Step 3. The jacking equipment is installed in the tank. The plates of the second shell ring (next to the top ring) are positioned outside the first one.Step4. The completed part of the tank (roof and top shell ring) is lifted hydraulically to a height at which the plates of the second ring can be moved into place and the roof sheeting can be completed.Step5. The plates of the second shell ring are located exactly and welded together to the lower edge of the first ring.Step6. The plates of the third shell ring are placed outside the second shell ring.Step7. The completed part of the tank (roof the two uppermost shell rings) is lifted.Step8. The above cycle of operations is repeated until the last (bottom) shell ring is finished.Step9. The entire tank is lowered down to the bottom plate and welded to this.Step10. The lifting equipment is dismantled.